The project

The Epping to Thornleigh Third Track project added a third track along the Main North line between Epping and Thornleigh, separating freight from passenger services on a shared section of the network. FR2 contributed for Transport for NSW.

Adding a track to an operating corridor is a staging problem before it is a construction problem: earthworks, structures, track and systems all have to be built alongside live running lines, with each stage handed over in a state that lets services continue. Freight paths add a second timetable to protect.

FR2 involvement

Planning and programme support for the project.

Related

Bring us in early. It costs less than bringing us in late.

Programming, constructability, project management, advice and technical support — tell us what the project needs and we will tell you plainly whether we are the right people for it.