FR2 reviewed the proposed design and proposed a delivery strategy for Blacktown ESAPs. This was presented to Sydney Trains to lock the required weekend possessions and nominate the sub-area. The purpose of this strategy was to optimize the delivery of construction works minimizing operational impacts to Blacktown Yard.
The deliverables (Report, Primavera P6 programme and PowerPoint presentation) were utilized as a baseline for the cost-estimators.